Reorder point calculator

Enter one product's numbers to see when it runs out, when to reorder, and how many units to order. Everything runs in your browser and nothing is sent anywhere.

Average daily salesunits sold ÷ days0.70 / day
Days to stockouton hand ÷ daily sales8.6 days
Lead-time demanddaily sales × lead time9.8
Safety stocklead-time demand × safety %, rounded up2
Reorder pointlead-time demand + safety stock, rounded up12
Suggested orderdaily sales × target days + safety stock − on hand17 units

Critical: stock runs out in 8.6 days, before a new order could arrive (14 days).

The formulas

These are the formulas the Forelark app uses. For a product with steady sales its daily forecast is exactly the simple average below; for trends, weekly patterns or slow sellers the app swaps in the forecasting method that tested best on that product, and the rest of the math stays the same.

Average daily sales

daily sales = units sold ÷ calendar days in the period

Count every calendar day, including days with zero sales. Averaging only over days that had sales overstates demand.

Days to stockout

days to stockout = units on hand ÷ daily sales

Lead-time demand and safety stock

lead-time demand = daily sales × lead time (days) safety stock = lead-time demand × safety % (round up)

Lead-time demand is what you expect to sell while waiting for a delivery. Safety stock covers a late shipment or a busier-than-usual week.

Reorder point

reorder point = lead-time demand + safety stock (round up)

When stock on hand falls to the reorder point, place the order. Waiting longer means the new stock arrives after you have sold out.

How many units to order

order quantity = daily sales × target days + safety stock − on hand

If the result is zero or negative you have enough stock; no order is needed yet.

Worked example

A running shoe sold 42 pairs in the last 60 days and you have 6 left. Your supplier takes 14 days, you keep a 20% buffer, and each order should last 30 days.

  1. Daily sales: 42 ÷ 60 = 0.70 per day.
  2. Days to stockout: 6 ÷ 0.70 = 8.6 days.
  3. Lead-time demand: 0.70 × 14 = 9.8 units.
  4. Safety stock: 9.8 × 20% = 1.96, rounded up to 2 units.
  5. Reorder point: 9.8 + 2 = 11.8, rounded up to 12 units. You have 6, so you are past it.
  6. Order quantity: 0.70 × 30 = 21, plus 2 safety stock = 23, minus 6 on hand = 17 units.

Stock runs out in 8.6 days but a new delivery takes 14, so this product will sell out for about five days even if you order today. That is the case the calculator marks critical.

Choosing your inputs

Common mistakes

Questions

What is the reorder point formula?

Reorder point = lead-time demand + safety stock, where lead-time demand is average daily sales multiplied by supplier lead time in days.

How do I calculate safety stock?

A simple, common approach is a percentage of lead-time demand, such as 20%. Raise it for unreliable suppliers or volatile sales, lower it for steady sellers with dependable delivery.

How is this different from the Forelark app?

The reorder math is the same. The app runs it for every variant in your Shopify store automatically from your real order history, and instead of a single average it tests several forecasting methods per product (exponential smoothing, a trend model, a slow-seller model, and on Growth and Pro a weekly-pattern model) and uses the most accurate one. It also counts stock already on order, ranks what needs attention and builds a purchase order.